Lead And Lead Compounds
Lead And Lead Compounds releases at Garfield Facility LLC rose from 920k lb to 1.7M lb between 2023 and 2024.
Total reported releases 1.8M lb more than doubled year over year (+80%). Total releases concentrations have more than doubled since 2011.
2601 W MOUNT PLEASANT BLVD, Muncie, Indiana · 331492 · Primary Metals · operated by Edison Group Cos LLC
Lead And Lead Compounds releases at Garfield Facility LLC rose from 920k lb to 1.7M lb between 2023 and 2024.
Arsenic And Arsenic Compounds releases at Garfield Facility LLC rose from 14k lb to 24k lb between 2023 and 2024.
Barium And Barium Compounds releases at Garfield Facility LLC fell from 43k lb to 19k lb (56% lower) between 2023 and 2024.
Lead And Lead Compounds concentrations have more than doubled since 2011.
Antimony And Antimony Compounds concentrations have more than doubled since 2010.
Arsenic And Arsenic Compounds concentrations have more than doubled since 2011.
Barium And Barium Compounds concentrations have more than doubled since 2010.
Within 3 miles of this facility (28 Census block groups, population-weighted demographics): a population of 27,095. Why we surface this →
Low-income
People of color
Under age 5
Over age 64
Source: Census ACS 2018-2022 block-group demographics, population-weighted across the 3-mile buffer around this facility (from USEPA-clone/EJAM-open blockgroupstats). Indicator-level percentile and EJ-disparity scores are surfaced on the county page and the state page — they describe wider regional exposure burdens, not effects attributable to a single facility.
Source. EPA Toxics Release Inventory · retrieved 2026-05-07. Reporting year 2024. TRI is a federal public-domain dataset under 17 USC §105.
What this is not. TRI quantifies releases reported by the facility under EPCRA §313 — not ambient air or water concentrations measured at receptors. We do not attribute individual health outcomes to specific facilities; that exceeds what the data can support.